Warning: Creating default object from empty value in /home/vgiwebs7/public_html/components/com_k2/models/item.php on line 503

Ranger Awarded $80.4 Million Design-Build Contract for Segment D of I-75 Express

Project Details

  • Project Name: I-75 Express Segment D
  • Project Location: Broward County, Florida
  • Project Value: $80.437 Million
  • Project Owner: FDOT
  • Project Scope:

    Ranger Construction has been awarded an $80.437 million design-build contract to add variable-toll express lanes to a section of I-75 in Broward County. Ranger's contract covers Segment D, a 3.7-mile section from south of Sheridan Street to north of C-11 Canal Bridge (north of Griffin Rd.).

    Ranger is also constructing Segment C of I-75 Express. They are two of five segments that together will add 15 miles of managed toll lanes, two lanes in each direction, built within I-75's existing median and extending from I-595 south into Miami-Dade County, with designated ingress and egress points along the way.

    A similar 13-mile project in Miami-Dade County will connect I-75 Express to Palmetto Express (SR-826), extending the toll lanes south past the Dolphin Expressway (SR-836) near Miami International Airport. FDOT Districts 4 and 6 are working collaboratively on the projects.

  • Project Start: Est. Mid-2014
  • Project Completion: 850 Days